Firewalls

Special Solutions

Most of our approved systems can be adapted to environments where it is necessary to sectorise large areas. Large industrial installations (nuclear, petrochemical, power plants), hangars and other storage facilities are often the target of this type of project.



Downloads

Corporate Presentation

Fire compartmentation system for escalators consisting of a sliding door with a hinged door coupled in 1 panel. In the open position, both sliding doors remain on the sides of the escalator wall with the hinged doors folded over them. When the fire signal is triggered, the whole assembly runs together to the front of the escalator, where the hinged doors open at 90° to form a square-shaped closure.

 



Downloads

Corporate Presentation

Horizontal sliding door with the door leaf parallel to the ceiling between floors. Motorised adaptation of the approved fire sliding tests.

 



Downloads

Corporate Presentation

Ei290 2-leaf horizontal fire door tested in accordance with UNE EN 1634-1 and classified in accordance with EN 13501-2. Consists of a door adaptation for use on non-trafficable ceiling/floor.

 



Downloads

Corporate Presentation