06 Oct Fire Door Engineering for Critical Environments: A Next-Generation Correctional Facility
ALFATORRES is involved in a next-generation correctional facility, working on the engineering of fire doors for critical environments
The Regional Ministry of Justice has launched a new model of open prison designed to promote genuine and effective reintegration. This environment prioritizes inmates’ autonomy, education, and social integration, without compromising the security standards essential to its proper operation.
Given the technical complexity of the project, the Department entrusted ALFATORRES to provide a comprehensive solution for door engineering in critical environments.
A complete project, from start to finish
Our involvement spanned the entire project cycle: the technical definition of specifications, the testing and certification of components, coordination with the various construction stakeholders, and the final installation of the systems. This complete work model—without subcontracting or intermediaries—ensures technical consistency and total control at every stage.
Implemented Solution: Komplet EI60 Door
The main solution installed in this project is our Komplet EI60 door, a system designed for demanding environments that combines the fire resistance performance required by regulations with the specific security requirements of correctional facilities
The Komplet EI60 door offers:
- EI60-certified fire resistance
- Adaptability to high-traffic environments with strict access control
- Integration with detection systems and automation
- Full regulatory compliance with current regulations
Engineering tailored to environments that allow no margin for error
This type of project reflects ALFATORRES’s approach to fire-rated door engineering in critical environments and facilities: it’s not just about supplying a product, but about understanding the project’s real needs, anticipating technical constraints, and offering a solution that performs reliably over time.
We would like to thank everyone for the trust placed in ALFATORRES and all the stakeholders who made this project possible.
Want to see more details about the project? Check out the original post on LinkedIn. [View on LinkedIn]
Want to see more projects? Visit our website. Consulta la web.